How long does an AT&T fiber install take?

  • Posted on: 07 Aug 2024
    image

  • The process of reaching your home and providing fiber optic Internet service Provider takes days, weeks or even months based on your geographical location and circumstances. However, the majority of fiber installations can be completed within a day to three days at most.

    The AT&T fiber installation process involves several steps

    Pre-Installation Site Survey

    First, you will need to arrange for a visit from an AT&T technician to determine detailed installation requirements based on the physical layout of your house. This pre-installation site survey is generally carried out 1-3 working days prior to the real installation. The technician will consider aspects like where to mount the fibre optic cable on the exterior and the internal areas of your house.

    Exterior Fiber Cable Work

    The first thing that the technician is going to do when installation is the laying of a slim fiber optic cable connecting your house to the nearest AT&T node. This often entails fixing the cable on telecommunication poles or otherwise, through conduits buried beneath the ground. Exterior work may cost more time depending on how far your home is from the fiber infrastructure network. This could take between 2-8 hours, depending on several factors such as the learners’ speed in grasping the concepts, their experience in e-learning, and the frequency of practice sessions.

    Installing Interior Cabling

    After the exterior fiber cable is attached to the home and AT&T network, the technician will bore a hole to bring the fiber optic cable to the interior of the house. The technician will pull cable through attic, crawl, walls, baseboards or ceilings to connect the AT&T hardware. Time taken to complete this process depends on the geographical structure of your house and where you wish to have your networking devices positioned, typically it will take 1-5 hours.

    Connecting and Activating Equipment

    Once the cabling within your home is complete, the technician will appropriately mount all the AT&T networking essentials such as the Internet Gateway router and your WiFi network. Finally, the technician will verify and reconnect all devices, engage the service, and guarantee a faster fiber Internet connection. Equipment setup and activation usually take about 1-2 hours of the technician’s time depending on the equipment used.

    Post-Installation Follow Up Appointment

    Sometimes, it may require another appointment after the installation process is done, if at all there are some challenges in ensuring the service is fully operational. So if you can schedule for a follow-up shortly after your installation perhaps within a week or two it would be good.

    To answer the question, let’s find out what influences fiber installation time.

    There are several variables that can influence the total time it takes to get AT&T fiber service installed for your home

    - Distance to fiber infrastructure – The longer or farther a home is to AT&T fiber installations the longer it takes.
    - Closeness to other homes – Homes that are closer to the other homes require more time and cable work because of the complex nature of the construction of multi-story homes or complex building designs.
    - Ordered add-ons - Extra services such as AT&T TV or home automation devices take more time.
    - Permits needed – If there are street or property permits that may be needed, the process will take some time longer.
    - Exteriors: rain/snow – You never know when it starts raining or snowing, and this may slow down exterior work.
    - No home access – Slow movement to get into condos, gated compounds, etc adds to the process.
    - Installation interferences – Physical barriers such as asbestos, lead paint, crawling spaces, etc, detected right through the installation process can lead to additional time.

    Tips for Streamlining Your AT&T Fiber Installation

    While standard installs take 1-3 days, there are a few things you can do to try and expedite the installation process

    • Scheduling – Don’t be too picky about getting a specific installation date because this method will have the service installed quicker. Weekends and nights may even have a faster time turn round than weekday appointments.
    • End user accommodation – Conduct additional works for the technicians to enable them access your homes especially for cable lines in areas such as attics, crawl spaces, basements etc. It also saves time to move furniture around before appointments are set and made.
    • Other things to consider – While placing the fiber order, check with the sales representatives whether there are any options for prioritized or accelerated installation of the fibers. It sometimes includes an added cost.
    • Use Automatic Payments – This is further effective in increasing the ease of account activation where technicians do not have to chase for monthly payments for installations done.

    Gauging the precise time for the installation of fiber by AT&T is not accurately predictable, but you can anticipate the professional technicians to get your high-speed internet installed within 1-3 days. Allow the install technicians to perform the majority of the intricate fiber optic cabling work to enable you to get connected to ultra-fast broadband. Use the following contact information to communicate with AT&T in case of other questions regarding your fiber installation.

    Call (844) 905-5001 to get a new AT&T connection now!

    Read More:

    Is AT&T good for streaming?

    How many devices can you have on AT&T Fiber?

    How much is AT&T streaming a month?

    Does ATT fiber use existing cable?

    Can you have 2 routers with ATT fiber?


  • Recommended For You