How long does it take to switch to AT&T fiber?

  • Posted on: 07 Aug 2024
    image

  • Stating that one needs to switch from their current internet service provider to AT&T fiber can change the connectivity in your home for the better with faster speeds and better reliability. But how much time does it really take to get AT&T fiber connectivity in place and experience all these advantages? These are the changes you can expect when making the leap to AT&T fiber optic Internet service.

    The Total Timeline

    To change to AT&T fiber there are several steps these being; placing an order, waiting for equipments, installation amongst others. All in all, it could take from 2 weeks to 6 weeks to get into operational status depending on the type of the order, but typically it takes 3 or 4 weeks in total. This schedule depends on the geographical location of your business and the available infrastructure.

    Here’s an overview of the typical timeline

    • Order Date: Order fiber internet by AT&T. The installation process begins on this date.
    • About 1 Week Later: Get receive the equipment provided by AT&T such an AT&T Wi-Fi Gateway modem/router combination. Install this equipment on your own or if this option has been chosen wait for your technician installment date.
    • 5-15 Days After Order: Technician stop by for appointment to connect AT&T fiber optic cables in your house if you didn’t self-connect equipment. Schedule for standard installs will kindly follow after your order date.
    • Up to 14 Business Days After Install: Internet, phone, and AT&T Channel Lineup and TV Listings service via fiber through AT&T begins with order date. Any earlier than that will depend on the speed of inside wiring and equipment installation.
    • Get connected with high internet speed through AT&T fiber optic services! Internet speeds of up to 1Gbps on the lower latency.

    In conclusion, there is roughly a 2-6 week waiting period between the moment you sign up with AT&T Fiber and the time you begin using the service. The actual install and activation part can easily cost 10 days if everything runs as expected and no hitches are encountered. Most are likely to take between two to four weeks in total when done comprehensively.

    Ordering Your Service

    The first step is to order the AT&T fiber optic internet service for a home, if you have not done so. Across the internet you can order food through the website of the restaurant or calling directly to the restaurant. Please note that fiber availability is contingent upon address, and hence AT&T will check for availability at your address.

    Once you summon success in ordering service, matters will begin shifting on how to plan your equipment delivery and/or technician installation. As of the moment, AT&T is giving away $250 in reward cards to assist you in saving money during the transition, and you order online, along with other bonuses such as free one-year subscription to HBO Max, depending on the current offers.

    Equipment Delivery and Self-Install

    As for installation, just remember that AT&T will deliver any equipment used to provide fiber connection to your house. This may include things such as the AT&T Wi-Fig Wi-Fi Gateway router and backup batteries if you have Voice over IP (VoIP) phone service ordered. It takes approximately five to ten days before the equipment you ordered gets to your workplace.

    Optionally, if provided, you can opt to install your own AT&T fiber equipment at home as it is detailed in the guidelines. This enables you to avoid costs of establishing the stand as sometimes promoter discounts may cover for the install costs. Self-installing your own equipment means you handle things like.

    • To establish the fibers.cables of the AT&T and cables to power the Gateway
    • Configuring the Gateway router through Wi-Fi configuration
    • So in case there are additional set-top boxes or other access points you need to link them.

    Despite the fact that, if you do not intend to set up your equipment on your own, then AT&T will dispatch a qualified technician to do that, as a part of the basic installation procedure.

    Technician Installation Visit

    If you did not choose the self-installation option for your AT&T fiber equipment, then you will be getting a call from the AT&T technician to set an appointment for installation during this order process. The date will be scheduled shortly after the delivery of the AT&T provided equipment to your organization.

    The technician will complete necessary steps like

    - Being connected through fiber optic cables in your unit if your house is not pre-connected.
    - Setting up the att wi fi gateway and starting its functions.
    - Extending networks to your router that has been installed with ONT networking box at either inside or outside your house.
    - Extending cables up to the AT&T fiber network connectivity test

    This appointment will call for fiber wiring and equipment installation, in a complete manner. This generally takes around 2-3 hours together with the technician depending on the work required in and out of your unit. This way after the tech visit you get AT&T internet, and even if the service is not activated, you get high speed internet within a week.

    Service Activation Steps

    After getting equipment placed and making all the necessary cable connections, provisioning occurs on the AT&T side to activate your fiber internet service. That is 5 to 14 days business days after you have had your installation appointment and completed successfully. AT&T handles steps like:

    • Communicating over a fiber line that runs to the gateway for data transmission.
    • This involves ensuring that the gateway modem of your broadband is in harmony with the fiber optic AT&T network.
    • If you have a subscriber account, get the new equipment installed to provision your account for use.

    You will then be notified once this is accomplished and ready to enjoy your AT&T fiber internet service. This lighting up of your connection may take the full-time frame or may happen earlier depending on the amount of workload on the AT&T side when your install happens.

    That concludes the critical entry points of the transition to fiber internet from AT&T. Depending on your location, after service activation you may cancel your existing ISP agreement in case of service transfer. Switching to AT&T ultra-fast fiber program primarily means waiting as the setup and installation take place over the roughly three or four weeks after the order has been placed, and since AT&T is responsible for the most part of the transfer process, it means that the process of changing to the new provider is indeed seamless. Before proceeding with the change over, it is advisable to contact the AT&T support whenever issues concerning service change over arise.

    Call (844) 905-5001 to get a new AT&T connection now!

    Read More:

    Why is my fiber internet so slow?

    What is the fastest ATT fiber speed?

    Is AT&T fiber unlimited data?

    Does ATT fiber use cable?

    Do you need a modem with fiber-optic internet?


  • Recommended For You